Resources

Buyer resources for an apparel order

Most quotation delays come from a document that was not ready, not from the factory. These are the inputs that decide how quickly and how accurately a brief can be answered.

Before you request a price

Before you request a price
Tech pack or reference Construction, measurements with tolerances, and a named fabric
Quantity breakdown Per size and per colour, not one total
Decoration Method, position, size and number of colours
Labels and packaging Artwork, care-label content and carton marks
Destination market Country and the labelling rules that apply there
Target ship date The date you need, so line time can be checked

Latest notes

Short, practical notes on the documents and decisions a production brief depends on.

Nothing on this site quotes a price, a minimum or a lead time as a site-wide figure. Those are confirmed per style and colour in the written quotation.

Send the pack you have, and we will name the gaps

A partial tech pack is enough to start. We list what is missing before costing, so the quotation is not built on assumptions.

Request a quote